Northwind Q3 cost reviewRead the report
Run run-nw-3
DoneStarted 2026-09-01 · three stages — A to C already happened on the connectors
Stages complete
3 / 3
Spend vs cap
$6.40 / $8.16
Elapsed
17m 31s
Coverage
81%
Recommendation · Replay · Cost report
Each stage shows what it was handed as well as what it produced. Ringed steps need a person.
Input
- Workloads in scope
- 7
- Snapshots
- snap-2026-09-01-a7f3, snap-2026-09-01-c118
- Residency
- EU
Output
- Recommendations
- 7MODELLED
- Withheld
- 1 — evidence truncated
R1.1Propose target model and configurationAUTO
R1.2Check target availability in the pinned regionAUTO
R1.3Withhold where evidence is truncatedAUTO
- Where truncation corrupted the evidence, the recommendation was withheld rather than guessed.
run outputarchived
[R1]run run-nw-3 assessment=as-northwind started=2026-09-01[R1][R1.1] proposing targets for 7 workloads[R1][R1.2] region check against EU[R1][R1.3] 1 recommendation withheld — evidence truncated[R2][GATE.approved] replay released[R2][R2.2] replayed 500 calls · spend $6.40 of $8.16[R2][R2.3] judge verdict: HOLDS[R3][R3.1] priced today's configuration from the billing export[R3][R3.2] scenarios S1–S3 built with ranges[R3][done] provenance signed
Completed in 17m 31s · replay spend $6.40 of $8.16 approved MEASURED · saving $2,257/month MODELLED